Laserfiche WebLink
<br />ESTIMATING FORM - REVEGETATION NORK cont'd Filename M089-4 sheet 2 of 2 <br />B. SHRUB 8 TREE TRANSPLANTS <br />____________________________ I ~ NATERIAL:~ PLANTING: I E/PERT. I TOTAL ~ TOTAL <br />SPECIES NAME I DUAN./ACRE I STOCK TYPE 8 SIZE E/PLANT E/PLANT I PELLET I E/PLANT ~ E/ACRE <br />No transplants required ~ ~ I ~ 50.00 <br />Total transplant cost/acre: 50.00 <br />C. SEEDBED PREPARATION ------------ <br />Tilling method #1: disc harrowing •• 5700.52 <br />#2: <br />D. SEED APPLICATION <br />Seeding method: drill seeding • <br />E. FERTILIZING <br />FERTI LI2ER / SOIL AMENDMENT <br />Materials used #7: No fertilizer/amendments required <br />#2: <br />#3: <br />Application method #1: No fertilizer application required <br />#2: <br />F. MULCHING <br />MULCN / NETTING / OTHER MATERIALS <br />_________________________________ <br />Materials used #1: straw (delivered) - ton <br />#2: <br />#3: <br />#4: <br />AppLicati on method #1: power mulcher (hay spr. 1" deep) •* <br />#2: crimping (with tractor) • <br />#3: <br />Total cost/acre: 8100.52 <br />____________ <br />Total cost/acre: 562.54 <br />UNITS/ACRE ~ UNIT E/UNIT I E/ACRE <br />50.00 <br />_______=====1==========1=========1_____________ <br />Total materials cost/acre: 50.00 <br />50.00 <br />Total application cost/acre: 50.00 <br />UNITS/ACRE ~ UNIT ~ E/UNIT ~ E/ACRE <br />_ _______ ______ ______ <br />____________ __________ _________ _____________ <br />2.00 ~ ton ~ 578.17 ~ 5156.34 <br />Total materials cost/acre: 5156.34 <br />562.42 <br />543.00 <br />Total application cost/acre: 5105.42 <br />G. JOB LOST =________ ___ <br />Total area to be seeded: <br />_ <br />_ 13.00 acres. Total E/acre <br />_ <br />__ <br />______ 5468.89 Total Initial Job Cost= <br />_________ 56,095. <br />_ <br />__ <br />_ <br />_____ 58 <br />___ <br />_ <br />_ <br />Estimated failure rate: _ <br />_ <br />_ <br />10.OOX of area. Total E/ac re• 5468.89 Total Reseeding Costs = _ <br />_ <br />_ <br />_ <br />5609. 56 <br /> • Reseeding cost items: A C D F GRAND TOTAL JOB COST - 56,705. 14 <br />