My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47119
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:11 PM
Creation date
11/20/2007 1:02:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
starts 2.01-1 ends 2.04-11
Section_Exhibit Name
RULE 2 PERMIT Sections 2.01 - 2.04
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.02 GENERAL REQUIREMENTS FOR COAL EXPLORATION <br />• <br />2.02.1 Scope <br />This section establishes the requirements for coal exploration outside <br />an approved permit area and is intended to ensure that such exploration is <br />conducted in a manner that protects the environment and complies with these <br />Rules. As set forth in Rule 1.04(22), coal exploration includes the <br />gathering of environmental data before beginning surface coal mining and <br />reclamation operations. These requirements include filing of notices of <br />intent when 250 tons or less of coal will be removed during exploration, <br />complying with coal exploration and reclamation standards, and ensuring <br />public availability of coal exploration information. <br />• <br />2.02.2 Exploration Involving Removal of 250 Tons or Less of Coal <br />A complete written notice of intention to explore and other pertinent <br />correspondence relating to locating the intake shaft for the Hawk's Nest <br />East Portal area is included in Appendix I. The revised exploration plan <br />involved drilling from the turnout on the access road using accepted <br />drilling procedures. This was done during August 1980 and again in <br />December 1980. Hydrologic and drilling reports are included in Appendix <br />II. If approval is obtained, WSC will drill three exploration holes on the <br />pending North Lease and three on the eastern portion of the existing mine. <br />Additional exploration may be done from inside the mine. <br />2.02.3 General Reouirements: Exol <br />No exploration activities will involve more than 250 tons of coal <br />• <br />removal. <br />2.02-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.