Laserfiche WebLink
2.01.3 General Requirements for Permits for__all_ Surface Coal Mi <br />• <br />• <br />i• <br />This is not a surface coal mining operation, therefore, this section <br />is not applicable. <br />2.01.4 Permit Requirements for New Surface Coal Mining and Reclamation <br />This is not anew surface coal mining operation, therefore, this <br />section is not applicable. <br />2.01.5 Permit Term <br />The permit term pursuant to the requirements of the Act and these <br />Rules is five years beginning at the date of approval by the Division. The <br />deadline for submission of the application is February 15, 1981. <br />2.01.6 Permit Fees <br />A fee of twenty-five dollars plus ten dollars for each acre of affected <br />land with a maximum of $2,500.00 is included with this permit application. <br />2.01-2 <br />