My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46806
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:55 PM
Creation date
11/20/2007 12:56:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 42 Part 3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Refer to Figure 23-24, Typical Channel Cross-Sections for the <br />configuration of this ditch. <br />Embankment Calculations <br />(a) The average pond surface area is 18,660 square feet. <br />Height from the pond bottom to sediment storage level is <br />0.76 acre-feet x 43,560 sq ft per acre/18,660 <br />sq ft 1.73 feet <br />Primary Spillway Discharge Point = 1.73 feet <br />(D) Height from pond bottom to design capacity level is <br />1.21 acre feet x 43,560 sq ft per acre/18.660 sq ft <br />= 2.82 feet <br /> <br />-• Emergency spillway - 1.0 feet higher than design <br />pond capacity level = 1.00 feet <br />Height from pond bottom to Emergency Spillway = 3.82 feet <br />(c) Design flow level of emergency spillway = 0.78 feet <br />Required height from flow lever to dam crest = 3.82 feet <br />Height from pond bottom to Emergency Spillway = 3.82 feet <br />70TA1. EMBAH109EH7 HEIGHT = 5,60 feet <br />(d) Minimum top width of embankment = <br />H + 35/5: H = 5.60 ft, 5.60 + 35/5 = 8.1 feet <br />L <br />Detailed cross sections of the embankment are found in Figure 23-27. <br />Typical Sedimentation Pond Cross-Section. <br />Sediment will be removed from the sedimentation pond when the vol~nne of <br />sediment accumu]ates to not greater than 60 percent of the design <br />sediment storage volume. Generally the pond will be cleaned during the <br />fall when the water levels are lowest and the least amount of <br />23-168 <br />
The URL can be used to link to this page
Your browser does not support the video tag.