Base Bid <br />25th Avenue Gravel Pit Storage Slurry Wall, Greeley, Colorado <br />Soil-Cement-Bentonite Backfill, Continuous Trench Method <br />Item Quantity Unit Unit Price <br />(US$) Extended Total <br />Price (US$) <br />Mobilization and Demobilization i Lump Sum <br />Working Platform Construction I Lump Sum <br />Vertical Barrier Wall Above <br />Unweathered Bedrock 461,000* Square Feet <br />Vertical Barrier Wall in <br />Unweathered Bedrock-Mudstone 23,900** Square Feet <br />Vertical Barrier Wall in <br />Unweathered Bedrock-Limestone 1,300** Square Feet <br />Site Reclamation 1 Lump Sum <br />TOTAL CONTRACT PRICE for Construction of all Facilities Shown or Specified <br />*The amount of square Footage for the Barrier Wall above Unweathered Bedrock is estimated. <br />Final square footage will be determined by measurement of the depth of the barrier wall every <br />201ineal feet from the approved top elevation of the Working Platform to the approved top <br />elevation of Unweathered Bedrock. The Owner's Representative will conduct or observe all <br />measuring described. The actual field quantities may vary from 0% to 20% of the estimated <br />amount indicated in the bid schedule. If the quantity exceeds 20% then either the Owner or the <br />Contractor has the right to negotiate the unit price. <br />**The amount of square footage for the Slurry Wall in Unweathered Bedrock (Mudstone and <br />Limestone) is estimated. Final square footage will be determined by approved measurements of <br />length and design vertical depth into Unweathered Bedrock in which the slurry wall is placed. <br />The Owner's Representative will conduct or observe all measuring described. Excess vertical <br />depth into the Unweathered Bedrock in which the the slurry wall is placed will be counted with <br />final square footage if approved by the Owner's Representative. The actual field quantities for <br />Mudstone may vary from 0% to 20% of the estimated amount indicated in the bid schedule. If <br />the quantity exceeds 20% then either the Owner or the Contractor has the right to negotiate the <br />unit price. The actual field quantities for Limestone may vary from 0% to 100% of the <br />estimated amount indicated in the bid schedule. If the quantity exceeds 100% then either the <br />Owner or the Contractor has the right to negotiate the unit price. <br />SECTION 00130 <br />PAGE 2 <br />