Laserfiche WebLink
SECTION 00130 <br />CITY OF GREELEY <br />BIDDING SCHEDULE <br />ARTICLE 1 <br />GENERAL <br />The Contract Documents present buildable designs for 3 feet thick soil-cement-bentonite barrier <br />wall using the continuous trench method. The Bidding schedule is comprised of extended unit <br />prices and lump sum prices, which form the base bid. <br />The Contractor shall certify that the cost of all labor, equipment, plant, materials, permits and <br />taxes necessary for proper completion of the work shall be included in the prices for each Bid <br />item shown herein. <br />ARTICLE 2 <br />EXECUTION AND WORKMANSHIP <br />The Contractor shall complete the base bid options as per the schedule provided. Failure to <br />complete the base bid options will result in the Bid being rejected. <br />