Laserfiche WebLink
1 <br />' temporarily in Stage 4. Where clay stockpiles are located in <br />Stage 4, topsoil will be removed and stored at another Stage 4 <br />location. <br />' The majority of Stage 2 is devoid of topsoil because of <br />' prelaw mining or because of the disturbance caused by the <br />sportscycle park. All recoverable topsoil will be stockpiled <br />' in Stage 6. A large amount of waste sand is expected to be <br />enncountered during the mining of the clays. The majority of <br />' waste sand will be stockpiled on the east side of Stage 2 for use <br />as backfill in later reclamation phases. All recoverable topsoil <br />1 from the east side of Stage 2 will also be stockpiled on the east <br />' side of Stage 2, though segregated from the waste sand. <br />As mining progresses, Stages 3 and 4 will be disturbed while <br />' Stages 2 and 6 remain active. While Stage 3 is being mined, only <br />enough topsoil needed to reclaim the stage will be stockpiled <br />' along the western side. Since the topsoil in Stage 3 is expected <br />' to be thick, the large amount remaining will be stockpiled in <br />Stage 7 where mining will never occur. Normally, the mined clay <br />' will be stockpiled adjacent to the area being mined, but some <br />clays or sand may be stockpiled in Stage 4. <br />' In the next progression, mining will affect Stages 4 and 5 <br />' while Stage 7 continues to be used for soil stockpiling. Mining <br />in Stage 2 is expected to be minimal during the period when <br />' Stages 4 and 5 are being mined. Topsoil from newly-disturbed <br />mined areas will be used to reclaim previously mined areas or <br />' will be stockpiled in Stage 7. The clay mined from other areas <br />' and stockpiled in Stage 4 will be removed by the time mining <br />II ~~ <br />