My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46725
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:50 PM
Creation date
11/20/2007 12:54:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981148
IBM Index Class Name
Permit File
Doc Date
8/26/1983
Doc Name
REGULAR 112 PERMIT APPLICATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> continue to save and segregate all soils encountered in disturbed <br />t areas. A discussion of location of the stockpiles is included in <br /> the subsection of Exhibit D entitle d "Mining Plan." <br />' When it is determined that a s tockpile of topsoil will <br /> remain in place and undisturbed for more than a year, the <br /> t <br />ith th <br />k <br />il <br />ill b <br />l <br />t <br />d d <br />i <br />f <br />ll <br />i <br />t <br /> s <br />e w <br />oc <br />p <br />e p <br />an <br />e <br />w <br />e ow <br />ng see <br />m <br />x <br />ure: <br />o <br />' Species Lbs/Acre (broadcast) <br /> Crested Wheatgrass, Fairway 6 ~ 9 <br />' Intermediate Wheatgrass <br />Yellow Sweetclover 6 j5 a <br />1 <br /> <br /> Total Lbs. per acre 13 x[.1.8 <br />' <br /> The mixture will be broadcast between March 15 and April 15 <br />' when weather conditions permit. Fertilizing and mulching is <br />considered unnecessary. <br />' Mining Plan. Reference is made to Exhibit D-1. Mining <br />will be conducted in seven stages. Because of the need to mine <br />' clays simultaneously from the north and south ends of the <br />' affected land, several mining stages will be affected at the <br />same time. <br />' Generally, Stage 2 will be mined continuously over the life <br />of the mine, while Stages 1, 3, 4 and 5 will be mined <br />' consecutively. <br />' During the early period of mining, Stages 1, 2, 4 and 5 will <br />be disturbed. As mining progresses to the north in Stage 1, the <br />' topsoils will be stockpiled along the eastern edge. The clay <br />normally will be stockpiled adjacent to the mining operation. In <br />' the event there is not enough stockpile area adjacent to the <br />' mined area or in the brick plants, clay will be stockpiled <br />ti <br />~~~ <br />3 <br />~~. <br />' 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.