My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46723
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46723
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:50 PM
Creation date
11/20/2007 12:54:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
11/8/1988
Section_Exhibit Name
APPENDIX Q ADEQUACY REVIEW QUESTIONS AND RESPONSES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Response: The erosion protection geotextile will have 6" minimun cover in <br />the area directly below the overflow notch and in the area below <br />the dam crest where flows are most concentrated. A 12" cover will <br />be placed on the berm side slopes. Figure D.9-2 has been revised <br />' to help clarify this issue. <br />Figure D.9-2 revised 2)15/89. <br />Section D.g.3 Drainage Crossings <br />57. Please describe the material that the River Naul-Road Crossing will be <br />I constructed of. <br />Response: Locally available alluvial or Santa Fe Conglomerate material will <br />be used for the construction. Riprap will be obtained from run- <br />of-mine materials. <br />Exhibit D, Section D.9.3 revised 4/20/89. <br />58. A11 chemical storage areas require storage in an area with impermeable <br />floors and associated containment berms to effectively contain any <br />possible leaks, breaks or spills from the containers. Please specify <br />the Location, materials and designs for the chemical containment areas. <br />Response: Chemicals used in the mill building will be contained in the mill <br />building. Mill building specifications will be provided upon <br />completion. Cyanide wi'1 be shipped to the site in Flo-Bins. Flo- <br />Bins are certified by DuPont and viewed by the U.S. Department <br />1 of Transportation as a safe method of transporting and storing <br />sodium cyanide. These Flo-Bins will be stored adjacen*. to the <br />mill building in a locked storage area. <br />i No application change necessary. <br />' Section D. 12 Accidents and F~nergency Response <br />59. Please provide additional information to the Emergency Response Plan <br />regarding any release of cyanide or other hazardous chemicals from <br />contained or controlled areas. This information should include <br />identification and contact information (phone number, address) of <br />persons or agencies to be contacted such as the County Sheriff, <br />Colorado Department of Health, Water Quality Control Division, and the <br />Colorado Division of Wildlife. The order in which the various persons <br />or agencies should be contacted, spill mitigation methods, <br />(detaxificatiort materials, methods, and procedures and assurance <br />sampling) spill impact and mitigation monitoring, (water, <br />spill-flow-path soil sampling, including sampling parameters), <br />emergency documentation and reporting procedures should be included. <br />A flow-chart outlining procedures to follow and persons to contact <br />would 6e helpful to site personnel at a time when quick, deliberate <br />action is required. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.