Laserfiche WebLink
<br />r 53. Please provide peak flow calculations for the South Waste Rock Disposal <br />Facility haul road culvert. <br />t Response: These calculations are provided on Table D.9-2. A WASHED printout <br />for this drainage area has been added to Appendix G. <br />Table D.9-2 and Appendix H revised 2/15/89. <br />54. A headwater-to-diameter ratio of about 2 was used in sizing culverts. <br />This design is acceptable if the downstream face of the embankment and <br />a sufficient )ength of channel bottom are armored with riprap. A design <br />for riprap size and extent should be submitted. The riprap <br />specifications required for the low-velocity drainage swale on the <br />river haul road crossing should also be included. <br />Response: Riprap design calculations are presented in Appendix L' for the <br />culvert outlets at the South Waste Rock Disposal Area Haul Road <br />Culvert and the Rito Seco crossing. <br />In summary, 12" DSO riprap is proposed for the South Waste Rock <br />Disposal Area culvert outlet for a length of 35 feet downstream <br />of the outlet. A 24" thick blanket is proposed for the channel <br />invert with an ]8" thick blanket over the channel sideslopes. <br />' For the Rito Seco crossing, 18" DSO riprap is proposed for a <br />length of 50 feet downstream of the culvert outlet. 36" and 27" <br />blankets are proposed for the channel invert and side slopes, <br />respectively. <br />The calculations are based on a riprap design method presented <br />in Urban Storm Drainage Criteria Manual (Wright-McLaughlin <br />Engineers, 1969). Very erodible materials were assumed to exist <br />in the channels for design purposes. Figure D.9-3 showing typical <br />riprap outlet protection has been adder to Section D.9. The <br />material used will be run of mine material placed using mine <br />equipment. <br />' Exhibit D, Section D.9 revised 2/15/89. <br />55. It appears that no erosion control/runoff control measures have been <br />1 established for the mill and concentrated ore stockpile areas. Please <br />locate a small ditch/bean similar to a roadside ditch, sized to the 10 <br />year, 24-hour flow, around the perimeter of both areas. <br />j Response: The details of drainage within the mill site area are part of the <br />detailed mill site plans which are being developed by others and <br />_ have not been completed. Details of the mill site drainage will <br />' be provided upon completion of the mill design. <br />Exhibit D, Section D.9.2 revised 4/20/89. <br />56. Pease explain what is meant by "Geotextile (6" and 12" minimum cover)" <br />in Typical Profiles (A-A'J and Typical Cross Section (B-B') in Figure <br />D.9-2. <br /> <br />