My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46723
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46723
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:50 PM
Creation date
11/20/2007 12:54:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
11/8/1988
Section_Exhibit Name
APPENDIX Q ADEQUACY REVIEW QUESTIONS AND RESPONSES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />around the entire heap perimeter; where the pregnant delivery pipe and <br />barren return pipes are routed; where these pipes enter the mill <br />faci]ity; etc. <br />Response: Figure C-10 (formerly Figure C-8) has been revised to include a <br />delineation of the facility pipeline corridor which traverses the <br />eastern and southern perimeter of the leach pad along the inside <br />of the access road. the mill facility pipeline configuration has <br />not yet been fully determined. Mill specifications will be <br />submitted upon completion. <br />Figure C-10 revised 2/15/89. <br />i 35. Sections E-f' and F-F' illustrated on Figure C-9 do not illustrate the <br />inclusion of the facility pipeline corridor to/from the pond/mill <br />facilities. Please include. <br />Response: Section F-F' on Figure C-11 (formerly Figure C-9) has been <br />revised to include the facility pipeline corridor. The pipeline <br />' corridor does not encircle the entire pad and is thus not <br />presented on Section E-E'. <br />Figure C-11 revised 2/15/89. <br />36. The Typical Section of Perimeter Berm and facility pipeline rorridor, <br />Detail 11, Figure C-10, does not illustrate a secondary recovery layer <br />I on the heap side of the berm. Please include. <br />Response: Detail 11 on Figure C-12 (formerly Figure C-10) has been revised <br />to illustrate a secondary recovery layer on the heap side of the <br />berm. <br />Figure C-12 revised 2/15/89. <br />i 37. Figure C-10, Detail 6, illustrates the Plan of Secondary Recovery/Leak <br />Detection System and Riser Pipe for Secondary Recovery/Leak Detection <br />Sumps. Please discuss whether this system networks under the entire <br />heap, or whether it is centraliied within the heap, and whether there <br />is more than one Leak Detection Sump. <br />' Response: The system shown on Figure C-12, Detail 6 is only present. in the <br />sump area of the leak detection/secondary recovery systen. There <br />are three such areas, one at the leach pad leak detection sump, <br />one at the barren pond leak detection sump, and one at the <br />pregnant pond leak detection sump. <br />No application change necessary. <br />Section D.7.4.2 Process Solution Ponds <br />38. The design parameters for sizing the pond capacity as stated are <br />appropriate. A comparison to the water balance simulation provided in <br />Appendix G shows the 52 acre-feet capacity to 6e exceeded at times by <br />the combination of draindown (varies from 24 to 28 ac-f t) and 100-year <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.