<br /> <br />Mine Plan <br />Size: The size of the permit boundary encompassing the <br />mining operation is 10 acres or less. The pit and <br />related soils stockpiles shall be within the <br />boundary. <br />Staging: The mining/reclamation operation is composed of <br />four (4) stages. Stages 1, 2, and 3 are mining <br />advance phases and Stage 4 is the final reclamation <br />phase. <br />Staging t•iethodology: The proposed pit area is divided into 3 <br />stages of equal size concerning surface area. By <br />this means, if mining operations terminate either <br />as scheduled or prematurely, adequate soils <br />(overburden and topsoil) are available to reclaim <br />disturbed areas during any phase of the operation <br />throughout the mine life. <br />Schedule: <br />Stage 1: Stripping, soils removal and mining are to <br />commence in Stage 1 which is located in the Nw <br />end of the proposed pit area. Topsoil and <br />overburden will be stored in separate <br />respective stockpiles in the SW corner of the <br />permit boundary area (Stage 1). <br />Stage 2: Stage 2 adjoins and lies on the east side of <br />Stage 1. After mining operations are <br />completed in Stage 1, topsoil is windrowed <br />aside on the Stage 2 area; overburden from <br />Stage 2 is removed and replaced on Stage 1; <br />the windrowed topsoil on Stage 2 is removed <br />and replaced on Stage 1. <br />Seeding (Stage 1): The topsoil replacement on Stage 1 <br />(and all stages) shall be scheduled so that <br />seeding can be done immediately and during the <br />proper season to deter wind/water erosion. if <br />topsoil is windrowed for any extended time, <br />the windrows side slopes will be reduced to <br />3H:lV maximum slope and temporary appropriate <br />seed mix will be sewn on the windrows to <br />reduce wind erosion. <br />Stage 3: Steps in Stage 2 <br />replacing soils <br />3. <br />will be repeated for Stage 3, <br />on Stage 2 removed from Stage <br />2 <br />