Laserfiche WebLink
• <br />EXHIBIT D`Ja <br />Reclamation Plan <br />The affected area will be reclaimed as the operation progresses. <br />The gravel will be extracted in a north to south and east to west <br />direction. Starting in the northwest corner of the area the excavation <br />will be reclaimed using a 3 foot to 1 foot slope using topsoil <br />previously stockpiled and reseeded with a grass recommended by the SCS. <br />As the operation proceeds from year to year and as the west boundary <br />becomes extracted out the 3 to 1 slope will continue to be extended~i <br />towards the south boundary. The south permit boundary will be sloped <br />also at a 3 to 1 grade and reseeded at the end of the operation. ~'he <br />3 to 1 slope will be seeded as it is created. The various seeding operation <br />will take place in the fall of the particular year. <br />The reclamation plan from SCS will be sent to you as sooffi as I have <br />received it from them. <br /> <br />Page 4 <br />