Laserfiche WebLink
CHAPTER 2 - DESCRIPTION OE THE ALTERNATIVES <br />This chapter describes the construction, operation, maintenance, and recla- <br />mation of each alternative. It also compares the economic feasibility of <br />each alternative. <br />The descriptions of alternatives are divided into five parts: physical des- <br />cription; construction; operations/maintenance; reclamation; and economic <br />feasibility. <br />The physical description part describes the general layout, operations, <br />lenyth and route. The construction part discusses the construction method. <br />It also describes the short-term post construction reclamation to be com- <br />pleted before operation. The operation/maintenance part describes the <br />specific procedures for operating and maintaininy the particular mode of <br />transport. The reclamation section discusses the shut-down and restoration <br />procedures utilized upon cessation of operations at Orchard Valley Mine. <br />Finally, the economic feasibility part compares the costs and benefits of <br />the alternatives. <br />The general area of study for all of the transportation alternatives is <br />shown on Drawing #1. It is generally bordered by Orchard Valley Mine to the <br />north, Steven's Gulch Road to the west, State Highway 133 to the south, and <br />CWI's storaye and loadout area to the east. <br />• <br />M <br />5 <br />