<br />8.2 Construction Testing Schedule <br />During construction, the following schedule will be used for <br />conducting Construction Control Tests on each of the materials <br />placed during a work shift. <br />Number of Tests Quantity of 1aterial Placed <br />1 test minimum Less than 2,000 cu yds <br />2 tests minimum 2,000 to 4,000 cu yds <br />1 test/2,000 cu yd Greater than 4,000 cu yds <br />Tests may be conducted more frequently at the direction of the <br />Engineer or the Engineer's representative. Such testing will be <br />done when indicated as necessary by the following guidelines: <br />1 <br /> 1) Areas where special compaction equipment or methods are <br /> used, <br /> 2) Areas where the height of fill rises quickly versus the <br /> quantity of fill placed. <br /> 3) Areas where compaction control is particularly important <br /> <br />1 such as around appurtenant structures. <br /> 4) Areas where the required compaction may not have been <br />' <br />5) achieved based upon visual observations. <br />bl <br />i <br />l <br />A <br />h <br />t <br />h <br />l <br />d <br />b <br /> reas w <br />ere unaccep <br />e mater <br />a <br />a <br />may <br />ave <br />een p <br />ace <br />. <br /> 6) Spot checks as required by the representative of a <br /> regulatory agency. <br /> 8.3 Quality Assurance Tests <br />Tests to be run for quality assurance are listed in the <br />following sections. Tests not listed may be run at the direction of <br />the Engineer. The Engineer or his representative will designate the <br />materials to be tested and the tests to be done. <br /> <br /> <br />N-30 <br /> <br />