Laserfiche WebLink
<br /> The Contractor shall maintain and protect fills in a condition <br /> satisfactory to the Engineer at all times until the final <br /> completion and acceptance of the work. Any approved fill material <br /> which becomes unsuitable for any reasons whatsoever, after being <br />' placed in the fill and before final acceptance of the work, shall <br /> be removed and replaced in a manner satisfactory to the Engineer by <br /> the Contractor at his own cost. <br /> 6.9 Compaction Equipment <br /> <br /> 6.9.1 General <br />I <br /> The Contractor shall provide sufficient compaction <br />' equipment of the types and sizes specified herein as is <br /> necessary for compaction of the various fill ma=erials as <br /> specified in Section 6.2. The Contractor will be <br />itt <br />d t <br />i <br />l <br />i <br /> perm <br />o use a <br />ternat <br />e <br />ve equ <br />pment, provided the <br /> Contractor can demonstrate to the Engineer :hat such <br /> alternate equipment will compact the fill material to a <br /> density not less than that which would be produced by the <br /> equipment specified; and that no undesirable features, <br /> such as stratification, will occur with the proposed <br /> alternate equipment. If the Contractor wishes; to use <br /> alternative equipment, he shall submit to the Engineer <br />' for approval complete details of said equipment: and the <br />d <br />h <br />d <br />i <br />' <br /> met <br />o <br />s propose <br />for <br />ts use. The Engineer <br />s aporoval of <br /> the use of alternative equipment will be conditional upon <br />1 the Contractor's construction of test fills at his own <br /> expense. Any approval of alternate equipment will not <br />I relieve the Contractor from responsibility of ~~btaining <br /> the specified compaction. <br />Tractors used for pulling compaction equipment shall <br />have sufficient power for the most adverse conditions to <br />be encountered during compaction of the fill and when the <br />compaction equipment is ballasted to the maximwn weight <br />N-17 <br />