My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46297
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:31 PM
Creation date
11/20/2007 12:42:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
11/8/1988
Section_Exhibit Name
APPENDIX N TECHNICAL SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i` <br />5.4 Leak Detection Sand and Gravel Blanket <br />The sand and gravel blanket between the liners in the solution <br />ponds and the leach pad shall be constructed of native soils <br />' excavated from the borrow area to the south and west of the heap <br />leach pads. The native soils shall consist of clean sand and gravel <br />materials with 15 percent or less silt-sized particles, a maximum <br />particle size of three inches, and having a permeability of 1 x <br />10-3 cm{sec or higher. <br />The minus No. 200 sieve material shall be non-plastic and the <br />gravel particles shall be rounded or subrounded. The sand and <br />gravel shall be free of rubbisfi and organic{vegetative matter. <br />5.5 Synthetic Liner Protection Layer <br />The synthetic liner protection layer shall be constructed of <br />crushed ore having a maximum particle size of 1/4 inch and a silt <br />~~ content of 12 percent or less. The crushed ore shall be well graded <br />throughout the sand fraction, and shall have a permeability of 1 x <br />10-2 cm/sec or higher. <br />5.6 Tailings Disposal Starter Dike <br />' The starter dike for <br />k di <br />ili <br />l f dry tailings disposal in <br />h <br />ll b <br />d t the south <br />h <br />li waste <br />d <br /> roc <br />sposa <br />ac <br />ty e constructe <br />s <br />a <br />o e <br />nes <br />t an <br /> dimensions shown in the drawings. Waste rock taken fron the mine <br /> pit(s) which consists of well-graded minus 24-inch material shall <br /> be used to construct the starter dike. Placement of material i n the <br />starter dike shall be by method specification developed by the <br />Contractor and approved by the Engineer to produce a stcble fill. <br />In-place native soils meeting the same specification may tre used as <br />an alternative to mine waste at the direction of the Engineer. <br /> <br /> <br />N-8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.