My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46135
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:23 PM
Creation date
11/20/2007 12:38:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020A
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Section_Exhibit Name
2.0 MINE PLAN
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.5-1 <br />• 2.5 SURFACE WATER MONITORING PROGRAM <br />A water quality monitoring program has been established to monitor the effect of mining <br />activities. Portions of this monitoring program, as well as the ground water monitoring <br />program, described in Section 2.6 will cover both the Munger Canyon and McClane Canyon <br />mines which operate in close proximity to one another in the same major watershed. Locations <br />of all surface water monitoring sites are shown on Figure 4.2.2.1s in Volume VIi. <br />The quantity of flow at SW-1 will be measured quarterly, contingent upon the availability of <br />water. The design of the bridge over East Salt Creek at McClane Canyon was developed to <br />allow easier monitoring of flow. A flow rating chart has been developed to ensure consistence <br />of flow measurements. Flow measurements will also be taken at SW-3, in Munger Creek below <br />the mine site. The measurements will ideally be taken twice a year if water is available to <br />sample. Measurements will be taken once during spring snow melt and once during a storm <br />event. Flow rating charts for both East Salt Creek and for the culvert at SW-3 are presented as <br />• Table 2.5.3. <br />Water all samples of East Salt Creek will be collected quarterly at sites SW 1, SW4,and <br />SW8 as shown on Figure 2.3-5. Water quality samples will also be taken on Munger Creek and <br />it butaries at sites SW-3, SW-6, and SW-7 twice a year; once during spring snow melt and <br />-~ <br />once during a storm event (spring or summer). Table 4.5.12 shows the results of the April, <br />1981 laboratory analyses from East Salt Creek monitoring locations SW-1 and SW-4. All water <br />samples will be analyzed for the parameters shown in Table 2.5-2. The results of all monitoring <br />will be submitted to the Regulatory Authority immediately following receipt of analytical results. <br />During periods of temporary cessation, the monitoring program will be modified as follows. <br />Water quality samples will betaken quarterly from SW-3. Samples will be analyzed for those <br />parameters listed in the temporary cessation portion of Table 2.5.2. The quantity of flow will <br />be measured at SW-3 when samples are collected. <br /> <br />Mu Volume I 1 •9 -96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.