Laserfiche WebLink
<br />:~ <br />• <br />• <br />Reclernation for the coal mine waste bank is planned contemporaneously during operations at <br />the completion of every 10 vertical feet of coal mine waste placed, as described in Section <br />4.1.5. At this time, the slope is pinned to be covered with 4 feet of suitable material and <br />revegstated. The cover will consist of the best available norf~toxie and non-combustible <br />materiab, as required by Rule 4.10.4(51. The cover material will be top dressed with topsoil <br />and revegetated, this will improve runoff and erosan conditbns. Final reclamation extends <br />to the final pile height and will include the recontouring and vegetation of ad haul roads. Ths <br />disturbed area wa be resumed as close as possible to its original state coruidering vegetative <br />growth and hydrology. <br />5.0 RECLAMATION <br />96266/1424.RPT Cul Mini W~~te B~Nc pMgn fa ene 9uiborn GNIC Mlrr <br />Oetotwr 199e WESTEC, iro. <br />22 <br />