Laserfiche WebLink
See Paragraph '~. O.B, will be stockpiled around perimeter, then dozed over edge of <br />bank 50' to 10(1'. This alluvium stands vertical for long periods of time, allowing <br />time for slope reconstruction to take place concurrent with mining. <br />See Paragraphs 1 & 3. <br />Crushing, Asphalt Plant, Concrete Plant. <br />On the pit floor and within the 100 AC of major disturbance. <br />'de have agreed to set back 100' from Boulder Creek; we have not agreed to anymore <br />setback than tie R.O.W.s owned. If anyone wanted more, they would have to purchase <br />same, except in the case of the Irrigation Ditch Agreement. For any damage that we <br />do to anyone or anything that we are liable for, we will compensate the owners. <br />4. Some Parshall Flumes exist and additional flumes will be installed to protect the <br />downstream users, as well as ourselves. The ditches are going to be relocated in <br />the same material they presently exist in. Ditch maintenance is an ongoing thing <br />by the ditch owners and natural vegetation establishes itself immediately in ditches <br />to stabilize the banks; however, much cleaning still needs to be done. The ditch <br />rider, the owners and ourselves monitor these ditches. <br />B. (Exhibit D) B.N.R.R. is abandoned. (Exhibit E & F) Last paragraph of Oil & Gas <br />Lease where we control R.O.W. width by Agreement. Pipelines: See E & F - The <br />owners of these utilities were all notified during hearing in Weld County, with <br />no concerns. We will compensate owners for damages that we are liable for. All <br />H 0, phone and power are within the County R.O.W. We will not mine within 25' <br />o~ County R.O.W. <br />