Laserfiche WebLink
State Highway Access Permit Page 3 <br />Attachment to Permit No. 103039 -Additional Terms and Conditions <br />Bid Plans Room <br />4201 East Arkansas Avenue <br />Denver, CO 80222-3400 <br />All materials, equipment, installation, construction, and design, including auxillary lane (s) and the <br />intersection improvements within state highway right-of--way, shall be in accordance with the applicable <br />CDOT and local jurisdictions standazds. <br />17 All work is to conform to the plans referenced by this permit on file with the Depaztment or as modified by <br />this pemrit. (If discrepancies arise, this permit shall take precedence over the plans.) The Departrnent or <br />issuing authority plan review is only for general conformance with the Department's design and code <br />'requirements. The Depaztment or issuing authority is not responsible for the accuracy and adequacy of the <br />design, dimensions, elevations and other elements which shall be confirmed and correlated at the work site. <br />The Department, through the approval of this document, assumes no responsibility for the completeness or <br />accuracy of the plans. <br />18. Survey markers or monuments must be preserved in their original positions. Notify the Department at <br />303-757-9744 immediately upon damage to or discovery of any such markers or monuments at the work site. <br />Any survey markers or monuments disturbed during execution of this permit shall be repaired and/or replaced <br />immediately at the expense of the Permittee. <br />19. Construction Plans must be approved by the Colorado Depaztment of Transportation, Region One, prior to the <br />issuance of the Notice to Proceed. <br />20. Signing and Striping Plans must be approved by the Colorado Department of Transportation, Region One, <br />prior to the issuance of the Notice to Proceed. <br />21. Traffic Control Plans must be approved by the Colorado Department of Transportation, Region One, prior to <br />the issuance of the Notice to Proceed. <br />22. Upon completion of the work, the Permittee/ContractorBngineer shall submit an "As Built" plan, showing in <br />detail al] construciton changes, modifications and revisions. All changes, modifications and revisions shall be <br />sealed and signed by a Colorado Registered Professional Engineer. <br />23. Upon completion of the work, a letter certifying that all project materials, construction, inspection and <br />workmanship was in accordance with the plans and applicable Department standards and specifications for <br />road and bridge construction shall be submitted to the Colorado Department of Transportation, Region One, <br />Traffic Section, 18500 East Colfax Ave., Aurora, CO. 80011. The certification letter must be sealed and <br />signed by a Colorado registered professional engineer. <br />24. The Petmittee must have available for review at the time of conditional acceptance, all documents relating to <br />construction (ie: plans, project correspondence, materials testing and survey notes). <br />25. In accordance with Section 2.5 (6) of the State Highway Access Code, final acceptance of the access <br />improvements by CDOT, Region One, will be provided to the Pennittee in writing two (2) yeazs from the date <br />of construction completion. If you have not received a final acceptance letter in two yeazs, please contact the <br />Region One Access Manager at 303-757-9123. <br />26. It shall be the responsibility of the Permitee to verify the location of the existing utilities and notify all utility <br />owners or operators of any work that might involve utilities within the State Highway right-of--way. Any work <br />necessary to protect existing perrnitted utilities, such as an encasement will be the responsibility of the <br />