<br />Methods of Minine <br /> <br />LaFarge will use the same mining techniques as [hey have used at other mining operations. The <br />operation will be open pit dry mining. Mitigation of groundwater impacts are discussed in <br />Exhibit G. <br />Dozers, scrapers, haul trucks and/or rubber tired front end loaders will be used to first remove the <br />topsoil and overburden. They will strip enough land to keep ahead of the mining progress. T~ <br />topsoil will he ctncoiled so not to imnede flood waters The same equipment will be used to <br />mine the sand and gravel. Field conveyors will transport the material from the mining face to the <br />processing area. When mining in Cell 4, a bridge over the River will cazry the conveyor. <br />Material will be crushed, screened (sorted) and washed. A portion of the aggregate will be <br />processed into asphalt or concrete. The processing facilities are portable and/or stationery and <br />will be moved when Lafarge begins to mine Cell 5. An asphalt and concrete batch plant will be <br />located on-site. <br />Some of the processed material will be washed. The settling basin will be located in the <br />southeast portion of the property neaz the wash plant. <br />Deserintion of Equipment on Site <br />The equipment used at this operation is typical of what is used at sand and gravel mining <br />operations. The equipment will be placed on the south side of the property and includes but is <br />not limited to the following: <br />Processing Equipment <br />-Crushers, screens, field conveyors, wash plant, asphalt batch plant, concrete batch and <br />casting plant, and settling basin. <br />Earth Moving Egu~ment <br />-Tractor trailers, dozers, front end loaders, scrapers. <br />Miscellaneous <br />-Dewatering pumps, trailer/office, maintenance shop and equipment, sanitary facilities, <br />water trucks, truck scale, full tank, outdoor storage. <br />D-3 <br />