Laserfiche WebLink
~- <br />Section 780.12(b) Continued. <br />All drainage from the overburden stockpile is collected in <br />sedimentation ponds A and B as shown on Map 16a, Kerr Mine Area <br />Surface Water Hydrology. The plans and specifications for these <br />ponds are found in Exhibit 42, Drainage and Sediment Control Plan. <br />Topsoil Stockpiles <br />Located adjacent to the overburden stockpile are three topsoil <br />stockpiles denoted in plan view as Topsoil Stockpile E-1, Topsoil <br />Stockpile E-2 and Topsoil Stockpile E-3 on Map 28a, Kerr Mine Area <br />Existing Structures and Map 34a, Kerr Mine Area Premining Topography. <br />Topsoil Stockpile E-1 occupies 3.1 acres, contains 47,100 cubic yards <br />of topsoil and will be used for reclamation of the <br />~~ <br /> <br />s= <br />780-19 bbR Revised - January, 1991 <br />