Laserfiche WebLink
COLORADO DEPARTMENT OF PUBL/C HEALTH AND ENVQtONMEM, Water Qua/iry Con+rnl Division <br />Adderdron ro Rationale -Page 2. Pemmit No. COG-850000 <br />II. STORMWA7ER MANAGEMENT PLANS <br />• 1) SWMP Admini.rtrnror <br />2) Materials handling and spill prevention <br />3J Erasion and sediment rorurob <br />4) Timing for non-stormwater <br />III. ADDITIONAL 177LyS AND CONDrITONS OF PERMr1' <br />A. ~DVMP Submittal <br />Submittal of the SR'MP is not autarnmioQBy required under this permit. Howevv, she Division rucNer the right to <br />regain submittal upon regtrar, and m review the SNMP mrd require additional mearmrs to prcnott and awurol <br />pollrttiom. /t is the Division's intent to request submiuion ojsuch plans selectively, based on repots of mn-mmpliana <br />with the permit. inspection reports, etc <br />B. SWMP Review/Chan¢u <br />Upon review of the SWMP, the Division may notify the pennittee m any time that die plan doer not mea one or ntorc of <br />the minimum rcquiremenu of this pmt. After such notifraation, the permittte will make ohastgu to the plar~ Unlccs <br />otherwise provided by the Division, the permitttt has 30 days trjTer tech notification to both makc the neceuary change <br />to the plan and to implanent than. <br />The permirtee shall amend the plan whenner dare is a rhange in design, ronstrs+ction, opertuion, or maintatmttt whirh <br />has a significant effect on the potential for the discharge of pollutants ro the warns of the State, or if the SWMP prover <br />ro be ineffective in adtieving the general objectives of controlling polfutams in stormwatn dutdtargu assoctattd with <br />mining operations. 71te anertdment to the SR'MP she!! bt made within 30 days of the drange. <br />• C. Comnrchensive Facilirv Inroections <br />the permittee will be required to make a thorough inspection of their starmwata management ryston, at /cart twitt per <br />year (in the spring and faU). Thee inspections must be documented and rummariZed in the annual report to the <br />Division. (See Par I. C.2 of the pnmit. J <br />D. Annual Reoort - Srormwater Drschareert <br />As outlined order Par /. C.2 ojthe permit, an annual report must be submitted to the Division, rovering January 1 <br />through Deconlrer 31, on the overall rompliantt with the SWMP. <br />77+e annual report will be due ro the Division on or before Febrrraty 15 of rash year. TTte eras due date jot the <br />permittee's first annual report will be Iirted in their ptrmit rntification. The Division ruerves the right to rtquirc <br />additional information in the report, on a casrby-case basis, as needed. (The permit previously established an annual <br />report due date which varied depending on when [he permit ttrtifrcation was issued.) <br />E. Choose ro Permit <br />Page 2, 6-10 and I3-IS ojthe pnmit have been amended,- page /3a has lxen added. Al! orhn permit rcquiranentr <br />shall remain the same. <br />Kathryn Dolan <br />May 12, 1994 <br />• F. Public Notice <br />No changes were made to the permit as a result of public entice rommems. <br />Kathryn Dolan <br />Octobn S, 1994 <br />