Laserfiche WebLink
<br />excavation. The static water level should be monitored quarterly during periods of operation. <br />If the mining operation, as shown by the monitoring program, does not significantly impact <br />the groundwater system, [he monitoring program may be discontinued through a Technical <br />Revision. <br />Please respond [o these concerns as soon as possible. The Division will consider these issues as <br />clarifications to the permit rather than a `'technical revision." The Division will need the above <br />mentioned items by 5:00 p.m. on October 30, 1998 in order to have the matter scheduled before <br />the November 18-19 Board Hearing. If these items are not received by the Division, the applicant <br />will need [o extend the permit decision due date and [his matter will scheduled for the December <br />16-17, 1998 Board Hearing. <br />Please call if you have any question. <br />Sincerely, <br />~~ Sc~~ <br />Erica S. Crosby <br />Environmental Protection Specialist <br />CC: Cazl Mount; DMG <br />Kent Crofts; IME <br />C:\esc\ l 12app\m98058\981029 <br />