My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44983
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:24 PM
Creation date
11/20/2007 12:08:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991073
IBM Index Class Name
Permit File
Doc Date
6/28/1991
Doc Name
Permit Application
Section_Exhibit Name
Application
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• -12- ~ibit D (page 1 of 4) <br />RECLAMATION PLAN <br />Grading, and Shapin <br />Slopes will be graded to permit the use of conventional equipment for <br />seedbed preparation, seeding, mulch application, and anchoring and mainten- <br />ance operations. Areas will be sloped to a 3:1 ratio slope or flatter. <br />Smaller areas of steeper slopes may be unavoidable but will be kept to <br />a minimum. Materials such as rocks and trash that will interfere with <br />planting will be removed. <br />Toysoiling <br />All upper soil horizons to be used in reconstructing the soil shall be <br />removed from the immediate area before mining. Ali of the A horizon shall <br />be remc•ved for use as surface soil on disturbed areas. If the A horizon <br />is less than 5 inches thick, enough material, other than bedrock, immedi- <br />ately below the A horizon can be removed and used to obtain this thickness. <br />Topsoil will be stockpiled. Stockpiles shall be selectively located and <br />protected from wind and water erosion, unnecessary compaction and contamina- <br />tion by undesireable materials. <br />Topsoil will be replaced when mining operations are completed. Before <br />spreading the topsoil, the re-graded areas must be scarified or ripped to <br />eliminate slippage surfaces and to promote root penetration. <br />ReveAetation <br />Seed Mix and Rate: <br />Refer to form CO-ECS-S for seeding mixture and rates. This seeding mixture <br />is comprised of grass species which are major components of the climax <br />community for this range site. <br />Fertilizer Requirements: <br />The rate of fertilizer application will be 40 pounds of nitrogen (N) and <br />40 pounds of phosphate (P205) per acre or as a laboratory soil analysis <br />indicates is needed. Animal manures or similar organic material may be <br />used to supply all or part of the specified nutrients. <br />Time of application shall be immediately prior to seeding, at the time of <br />seeding, or immediately following seeding, as applicable to the kind of <br />fertilizer and type of equipment used. <br />Seedbed Preparation and Planting: <br />The seedbed shall be well settled and firm, but friable enough that seed <br />
The URL can be used to link to this page
Your browser does not support the video tag.