Laserfiche WebLink
CIRCES Cost Estimatinstl Software <br />PROJECT IDENTIFICATION <br />Task # : 073 <br />Date : 04/052006 <br />User : JRS <br />Permitfob# :C-81-022 <br />Abbreviation :none <br />Filename :C022-073 <br />Average push gradient <br />Average site altitude <br />Agency or organization name :Colorado Division O(Minerals And <br />Permit or other job action :2006 Midterm Review <br />Task description :Replace Topsoil from Stoc <br />HOURLY EQUIPMENT COST <br />to Drill Pads from MR-56 and 57 and ; <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> Dala source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $56.94 NA <br />Operating cosUhour : $104.98 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost/hour : $32.53 NA <br />Total unit cosUhour : $194.45 Total Fleet cosUhour : $583.36 <br /> <br />MATERfAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,420 CCY factor : 1.125 volume : 3,848 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly production <br />Material Consistency description <br />Consolidated stockpile <br />State :Colorado <br />County :Delta <br />Site : Sanborn Creek Mine <br />150 feet <br />910.5 LCY/hr <br />Material weight <br />Weight description <br />Earth -Dry packed <br />5.00 % (1 <br />7, 850 feet <br />2, 550 IbslLCY <br />Job Condition Corcectio0_Factors <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 0.95 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Nei cortection : 0.39 <br />Source <br />Adjusted unit production : 350.93 LCY/hr <br />Adjusted fleet production : 1,052.78 LCY/hr <br />Fleet size : 3 Dozers) Total job time : 3.65 Hours <br />Unit cost : $0.554 /LCY Total job cost : $2,132 <br />