Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 07Y <br />Date : 04/05/2006 <br />User: JRS <br />State :Colorado <br />County :Delta <br />Site :Sanborn Creek Mine <br />Permitlob# : C-81-022 <br />Abbreviation :none <br />Filename : C022-072 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :2006 Midterm Review <br />task description :Replace Topsoil from Stockpile to <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 230 CCY <br />Swell Loose <br />factor : 1.125 volume <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 250 feet <br />Unadjusted howdy production : 546.0 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Dry packed <br />5.00 % <br />8, 000 feet <br />2,550 Ibs/LCY <br />JOB TIME AND COS7 <br />Fleet size <br />Unit cost <br />3 Dozers) <br />$0.924 /LCY <br />Use Road to CBM-15 <br />Basic machine : Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Utilization <br />OwnershipcosUhour : $56.94 NA <br />Operating cosUhour : $104.98 f00 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cosUhour : $32.53 Nq <br />Total unit cosUhour : $194.45 Total fleet cosUhour <br />Horsepower: 405 <br />Shift basis : f perday <br />Data source : (CRG) <br />259 <br />$583.38 <br />LCY <br />0 ondition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HB <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshiry/da <br />Spoil pile : 0.80 (fnd-rt) <br />Push gradient : 0.90 (Cat H8) <br />Altitude : 0.95 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.39 <br />Adjusted unit production : 210.44 LCY/hr <br />Adjusted fleet production : 631.32 LCY/hr <br />Total job time : 0.41 Hours <br />Total job cost : $239 <br />