Laserfiche WebLink
EXHIBIT D (Cont'd) <br />material hoppers, parking for bulk cement trucks and concrete <br />delivery trucks, a shop and parts building approximately <br />40 x 100 feet, an office building approximately 30 x 30 feet, <br />and parking and accessory areas. <br />Mining Timetable. Because of the uncertainty of current <br />economic conditions in the construction industry, accurate <br />forecasts over the next 27-year period are nearly impossible. <br />Therefore, the operator has elected to estimate a mining <br />timetable based on an average year and expects a specific <br />year to vary widely from the average. <br />Mining Timetable <br />Loesch Pit <br />Mining Total Mined Average Annual <br />Stage Years Acrest Acres± Tonnage <br /> <br />I 4 - 6 12.18 10.80 100,000 <br />II 4 - 6 26.68 25.94 200,000 <br />III 4 - 6 35.80 30.16 250,000 <br />IV 4 - 6 30.90 29.37 300,000 <br />V 4 - 6 41.53 38.35 350,000 <br />VI 1 - 3 17.77 13.85 350,.000 <br />P Life of 5.50 3.07 60,200 <br /> Mine <br /> <br />Total Affected <br />Land: 170.06 151.54 <br />-12- <br />