Laserfiche WebLink
EXHIBIT D (Cont'd) <br />1 tonnage of fill material that will be available or where it <br />will be available. Whatever amount of overburden is avail- <br />able as excess will be used for the creation of shoreline <br />irregularities. <br />~ Processing equipment may include, but is not limited to, <br />1 a low-profile plant consisting of a primary jaw crusher, roll <br />or cone crushers, screens, classifiers and conveyors. The <br />processing plant area will be lOt acres. The plant will be <br />J ~ <br />reasonably portable. The first location will be in the north- <br />east and the final location will be on the southwest end of <br />the area. Equipment will be operated in compliance with state <br />air pollution standards. A Colorado Department of Health <br />Emissions Control Permit will be obtained. <br />This is a semi-dry operation and the operator expects <br />no unusual problem with fugitive dust. Water consumption for <br />dust suppression can only be estimated since the variables <br />of operating days, windy days, rainy or snowy days and number <br />of affected acres fluctuate drastically. Our best estimate <br />of annual water useage is 10 acre feet. In addition, it is <br />1 ~. <br />expected that the ash plant will consume approximately 28 <br />acre feet per year. Thus, total water useage is expected to <br />be approximately 38 acre feet per year. Necessary water will <br />be provided under water rights owned by the operator. <br />The area designated as the plant and office complex <br />` will include a~concrete batch plant, cement silos, fly ash <br />I silos, a set of platform scales, material conveyors, <br />I -11- <br />