Laserfiche WebLink
<br />5.0 RECLAMATION <br />Reclamation and revegetation procedures, methods and practices to be used to effectively <br />reclaim surface disturbances associated with the Yankee Gulch Project, and the success <br />standards for revegetation and their associated monitoring methodoloeies are described in this <br />section. Sequencing of reclamation operations is discussed first, followed by more detailed <br />descriptions of each reclamation activity. Following the reclamation operations section, a <br />description of vegetation development and noxious weed monitoring and management is <br />presented. Revegetatton monitoring and success criteria are presented in the final subsection. <br />~.1 RECLAMATION OPERATIONS -WELL FIELD AND FACILITIES <br />The reclamation process involves backtilling and grading disturbed areas to final topographic <br />configurations. redistributing topdressing and reconstructing soils that provide a suitable plant <br />growth medium, and revegetating the area with plant species which provide vegetation cover <br />which promotes site stability and is capable of supporting the postmining land use. Following <br />completion and retirement of mining panels or closure and decommissioning of facility areas. <br />reclamation will normally he performed in the following sequence: <br />I) Buildings structures and other improvements will be demolished and removed to the extent <br />this is physically and economically possible. Salvageable items will be recycled. Non- <br />salvageable structures, facilities, slab footings and foundations will be demolished and <br />either buried on-site or disposed of off-site at an approved location. On-site burial of <br />concrete or asphalt will be subject to prior approval by the BLM; <br />?) Backfilling and grading operations will be perfot~tted to create acceptable surface <br />configurations: <br />3) Drainages will be recons[tucted as an integral part of backtilling and grading operations: <br />-1) Topdressing materials will he selectively redistributed to reconstruct suitable plant growth <br />mediums: and <br />~) Topdresscd :ueas will be revegetated. <br />During site reclamation. appropriate erosion and sediment control measures will be constructed <br />and maintained. Before final reclamation of each well field. American Soda will contact the <br />BLM to arrange a joint mspec[ion oC the site to determine if any reasonable and necessary <br />changes, revisions or additions need to be made to the approved restoration and rehabilitation <br />plan. <br />Reclamation operations will incorporate the planning and general considerations detailed in <br />Section 3.0 to the extent that they are applicable and effective. Reclamation activity scheduling <br />will be influenced by seasonal climatic conditions. Seeding and planting will be coordinated <br />with other reclamation activities to occur as soon as practicable after seedbed preparation has <br />been completed. Inspections of ongoing reclamation and revegetation operations will be made <br />on a periodic basis with operational adjustments or corrective measures being implemented as <br />necessary. Detailed records of reclamation and revegetation operations \vill be kept for <br />evaluation and management purposes. <br />Reclamation of the facilities areas will proceed in [he same general sequence described above. <br />but there will be variations in reclamation procedures for the Piceance and Parachute facility <br />\mencan Sala. L.L.P. 5-1 <br />foil Conservation. Erosion and Sediment <br />l'untrol. reclariw[ion and Revegewtion Plan <br />i lctoher 'ti. 1998 <br />Kevised Apnl 9. 1999 <br />