Laserfiche WebLink
<br />3.0 PLANNING AND GENERAL CONSIDERATIONS <br />3.1 OBJECTIVES AND GOALS <br />The Plan considers both short-term and long-term objectives, and incorporates interim <br />environmental goals and permanent reclamation goals into the planning process. These <br />objectives and goals will be considered throughout the project life to ensure the selection and <br />implementation of the most appropriate erosion control and reclamation methods and <br />procedures relative to project development, operational and closure activities. <br />3.1.1 Objectives <br />Short-term objectives of this plan are to conserve and protect topsoil, to control erosion and <br />sedimentation, to protect water quality and aquatic resources, to promote revegetation success, <br />and to minimize impacts to adjacent land uses and ecological resources. Properly executed <br />construction practices, optimum scheduling of activities, and ongoing evaluation by American <br />Soda, its contractors, and the BLM will ensure successful development, operation and <br />reclamation of the Yankee Gulch Project. <br />Long-term objectives include controlling erosion and sedimentation; restoring topography, <br />water resources, soils, and vegetation to conditions similar to or better than those existing prior <br />to disturbance; and limiting the introduction and spread of noxious weeds. Monitoring <br />activities implemented during the development, operation, and closure of project components <br />will evaluate the success of erosion control and revegetation efforts. <br />3.1.2 Interim Environmental Goals <br />During active operations, a number of interim environmental goals will be used in planning and <br />performing solution mining activities. These goals include: <br />• Potential adverse impacts to human health, safety and the environment will be prevented, <br />controlled, or mitigated: <br />• Environmental protection, mitigation of unavoidable adverse impacts and resource <br />restoration will be integral guiding components of development and exploration activities; <br />• Protection, mitigation and restoration practices and methods wilt be applied and performed <br />selectively based on site requirements, disturbance type and economic efficiency; and <br />• Protection, mitigation and restoration activities will be performed promptly and timely. <br />It should be emphasized that the unique conditions and needs of the Yankee Gulch Project site <br />will be considered in choosing reclamation practices and methods. Reclamation practices and <br />methods may be used singly or in combination to maximize their effectiveness within the <br />disturbed area. The holistic needs of disturbed and adjacent undisturbed areas, as well as the <br />effects and impacts of operation and reclamauon activities, will be considered in planning and <br />operation efforts. <br />American Soda L.L.P. 3- I <br />Soil Conservmion. Plosion and Sedimem <br />Control. Rcclanmian, and Revegetation Plan <br />October?tl, 1998 <br />Revised Apnl9. 1999 <br />