Laserfiche WebLink
• Technical Revision (TR-24) was submitted on October 8, 2003 and presented plans fot Pond • <br />O11A and post-mine channel YPM-12. The proposed decision to approve was issued on March <br />2, 2003. <br />• Technical Revision (TR-252 was submitted on November 10, 2003 and addressed post-mine <br />channel XPM-13, revised the PMT at the Valora Pit, and requested a variance for backfill and <br />grading. The proposed derision to approve was issued on October 6, 2004. <br />• Technical Revision (I'R-26) was submitted on October 4, 2004 and provided the as-built and <br />certification for Pond 013. The proposed decision to approve was issued on November 22, <br />2004. <br />• Technical Revision (1'R-27) was submitted on October 25, 2004 and provided the as-built <br />report and certification for Pond 01IA. The proposed derision to approve was issued on <br />December 13, 2004. <br />• Permit Renewal (RN-02) submitted on February 1, 2:005, applied for another 5-year extension <br />to the permit term. The proposed derision to approve was issued on August 2, 2005. <br />• Technical Revision (TR-28) submitted in March 2005, updates the life-of--mine plan fot coal <br />production and presents the reclamation schedule fot rite next five-yeaz permit term. The <br />proposed derision to approve was issued on May 20, 2005. <br />• Permit Revision (PR-02) submitted in March 2005, updated the life-of--mine plan for coal <br />production and presented the reclamation schedule for the nett five-yeaz permit term. This PR <br />remains under review. <br />• <br />• <br />PRA2 4 Revised 10/OS <br />