My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44719
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44719
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:10 PM
Creation date
11/20/2007 12:02:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082A
IBM Index Class Name
Permit File
Doc Date
2/28/2006
Section_Exhibit Name
Tab 1 Permit Summary
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Technical Revtsion_(TR-08) was submitted on December 17, 1997 and presented the as-built <br /> and certification for Pond 011 and updated the NPDFS and water rights information. The <br /> proposed deasion to approve was issued on January 2, 1998. <br />• Technical Revision (TR-09) was submitted on February 9,1998 and provided the as-built and <br /> certifications for Haul Roads A and B. The proposed deasion to approve was issued on May 11, <br /> 1998. <br />• Technical Revision (TR-101 was submitted on August 3, 1998 and addressed an increase in <br /> reclamation bond resulting from the Midterm review. The proposed decision to approve was <br /> issued on October 5,1999. <br />• Permit Revision R-Ol) was submitted on Mazch 1,1999 and provided updated, detailed life- <br /> of-mine plans for the mining, reclamation, and related operations for the Yoast Mine past the <br /> original five-year permit term. The proposed derision to approve was issued on Octobez 15, <br /> 1999. <br />• Tshnical Revision (TR-Il) was submitted May 27, 1999 and addressed preliminary <br /> development activities at the Yoast South Area. The proposed derision to approve was issued <br /> on July 1, 1999. <br />• Permit Renewal Application (RN-Ol) was submitted on January 28, 2000 for a successive five- <br /> year permit term. The proposed decision to approve the permit renewal application was issued <br /> on March 6, 200]. <br />• Technical Revision (TR_72) was submitted on Mazch 22, 2000 and provided the as-built and <br /> certification for Pond 012. The proposed derision to approve was issued on May 3, 2000. <br />• Technical Revision (TR-13) was submitted on Mazch 27, 2000 and presented an inadental <br /> increase to the disturbed azea. The proposed deasion to approve was issued on May 16, 2000. <br />• • Technical Revision R-14) was submitted on Apri127, 2000 and provided a stability analysis <br /> for Pond 014 embankment The proposed deasion to approve was issued on July 5, 2000. <br />• Technical Revision {TR-15) was submitted on January 11, 2001 and updated the mine plan to <br /> utilize auger mining methods in final highwall areas. The proposed decision to approve was <br /> issued on February 15, 2001. <br />• Technical Revision (TR-16) was submitted on June 20, 2001 and updated changes to the <br /> hydrologic monitoring program. The proposed derision to approve was issued on July 30, 2001. <br />• Technical Revision (TR-17) was submitted on June 28, 2001 and provided an as-built <br /> certification for a portion of Haul Road D. The proposed deasion to approve was issued on <br /> July 30, 2001. <br />• Technical Revision (TR-181 was submitted on June 28, 2001 and presented a remedial plan <br /> and slope stability analysis for the landslide above Pond 012. The proposed decision to approve <br /> was issued on October 3, 2001. <br />• Technical Revision R-19) was submitted on November 16, 2001 and provided the as-built <br /> and certification for Pond 014. The proposed deasion to approve was issued on January 14, <br /> 2002. <br />• Technical Revision (TR-20) was submitted on December 10, 2001 and addressed changes to <br /> the rechunation schedule for the north tnin$tg azea. The proposed derision to approve was <br /> issued on March 7, 2002. <br />• Technical Revision (TR-21) was submitted on July 15, 2002 and incorporated highwall [Wining <br /> into the mine plan. The proposed deasion to approve was issued on September 3Q 2002. <br />• Technical Revision (T'R_22) was submitted on December 5, 2002 and presented changes to <br /> the hydrologic monitoring program and revised the timing of surface disturbance. The proposed <br />• <br />• decision to approve was issued on January 6, 2003. <br />Technical Revision (TR-23) was submitted on July 25, 2003 and provided for an increase in <br /> disturbance azea. The proposed deasion to approve was issued on September 9, 2003 <br />PR-02 3 Revised 10/OS <br />
The URL can be used to link to this page
Your browser does not support the video tag.