My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44691
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44691
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:08 PM
Creation date
11/20/2007 12:01:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987038
IBM Index Class Name
Permit File
Doc Date
3/4/1987
Doc Name
GOSNEY & SONS INC REGULAR 112 APPLICATION BAYFIELD PIT 1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ • i <br />' Exhibit E - Reclamation Plan <br />' Post-mining reclamation plans include developing the property for a <br />few cabin sites. However, until plans regarding this use are finalized, an <br />alternate plan for revegetation is provided. The goal of reclamation will <br />' be to stabilize the site and return the area to limited rangeland/non- <br />irrigated pasture; portions of the property will remain undisturbed (the <br />westerly side of the site) and thus remain suitable as limited wildlife <br />habitat. A lake of approximately 20.9± acres will be created. The <br />remainder of the disturbed land will be revegetated. The Exhibit F map <br />' <br /> <br />' included herein portrays the anticipated final topography of the site. <br />Reclamation will be implemented in conjunction with mining operations. <br />As described in Exhibit D, there will be essentially two phases to the <br />operation. Final slopes are developed in during the course of mining <br />Once the operation moves out of Phase 1, reclamation may occur in that area <br />' while operations continue in the~h sese 2~1rea_ <br /> All final slopes of the pond will be graded to no steeper than 2:1, <br />' except from S feet above to 10 feet below the expected water line where <br /> slopes shall not be steeper than 3:1. Very little, if any, grading will be <br />' the <br />ond (th <br />se areas awa <br />from <br />r <br />ed <br />rf <br />e <br />r <br />s surrou <br />di <br />i <br />th <br /> y <br />r <br />n <br />ng <br />p <br />equ <br />on <br />e su <br />ac <br />a <br />ea <br />o <br />' the shore). The final surface configuration of the lands surrounding the <br /> pond, except the shore, will be identical to the existing surface slopes of <br />' about one to three percent. Soil salvaged during operations will be used <br />i for replacement on disturbed areas. The soil will be spread to a depth of <br />' <br /> about 8-10 inches on disturbed areas. <br />' Prior to reseeding, any compacted areas will first be scarified. The <br />disturbed areas will then be seeded with the mixture appearing below. The <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.