My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44640
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:06 PM
Creation date
11/20/2007 12:00:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
5/12/2003
Doc Name
Section 9 & Section 10 (report April 7, 2003)
Section_Exhibit Name
Volume VII Geotechnical Studies
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M03086GE <br />I. <br />the project through the construction of the project. This service <br />will also allow us to revise our recommendations if conditions <br />occur or are discovered during construction that were not evidenced <br />during the initial study. We suggest that the owner and the <br />1 contractor make provisions in their construction budget and con- <br />struction schedule to accommodate unexpected subsurface conditions. <br />We represent that our services were performed within the limits <br />prescribed by you and with the usual thoroughness and competence of <br />the current accepted practice of the geotechnical engineering pro- <br />fession in the area. No warranty or representation either ex- <br />pressed or implied is included or intended in this report or our <br />contract. We are available to discuss our findings with you. If <br />you have any questions please contact us~. The supporting data for <br />this report is included in the accompanying figures and appendices. <br />This report is a product of Lambert and Associates. Excerpts <br />from this report used in other documents may not convey the intent <br />or proper concepts when taken out of context, or they may be <br />misinterpreted or used incorrectly. Reproduction, in part or <br />whole, of this document without prior written consent of Lambert <br />and Associates is prohibited. <br />This report and information presented can be used only for this <br />site, for this proposed development, and only for the client for <br />whom our work was performed. Any other circumstances are not <br />appropriate applications of this information. Other development <br />~ plans will require project specific review by us. <br />l~ <br />I <br />We have enclosed a copy of a brief discussion about geotechnical <br />engineering reports published by Association of Soil and Foundation <br />Engineers for your reference. <br />Please call when further consultation or observations and tests <br />are required. <br />If you have any questions concerning this report or if we may be <br />of further assistance, please contact us. <br />Respectfully submitted; • <br />LAMBERT AND ASSOCIA ES Reviewed_by: ---- <br />~~~~ ~~ - - <br />rman W. J ston, P.E. ~s rt, P.E. <br />anager G ~ echnical Engineer Principal Geotechnical Engineer <br />NWJ/nr <br />~~ <br />~Lam6ert ana ~soociateo <br />CONSULTING GEOTEGNNICAL ENGINEERS ANG <br />MATERIAL TESTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.