My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44640
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:06 PM
Creation date
11/20/2007 12:00:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
5/12/2003
Doc Name
Section 9 & Section 10 (report April 7, 2003)
Section_Exhibit Name
Volume VII Geotechnical Studies
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M03086GE <br />testing during construction and your budget reflect these provi- <br />sions. <br />It is difficult to predict if unexpected subsurface conditions <br />will be encountered during construction. Since such conditions may <br />be found, we suggest that the owner and the contractor make provi- <br />sions in their budget and construction schedule to accommodate <br />unexpected subsurface conditions. <br />3.1 Fill Considerations <br />It is our understanding that the proposed development will <br />include compacted fill. The quality of compacted fill will depend <br />on the type of material used as fill, fill lift thickness, fill <br />moisture condition and compactive effort used during construction <br />of the structural fill. Engineering observation and testing of <br />fill is essential as an aid to safeguard the quality and perfor- <br />mance of the fill. <br />Testing of the fill normally includes in-place moisture content <br />and dry density tests to indicate the relative compaction of the <br />placed fill as it is constructed. We recommend that your budget <br />include provisions for observation and testing of fill during <br />construction. <br />Testing of the compacted fill material should include tests of <br />J the moisture content and density of the fill material placed and <br />compacted prior to placement of additional fill material. We <br />suggest that a reasonable number of density tests of the fill <br />material can best be determined on a site, material and constructi- <br />on basis although as a guideline we suggest one test per about each <br />300 to 500 square feet of each lift of fill material. Utility <br />trench backfill may need to be tested about every 100 linear feet <br />1 of lift of backfill. <br />4.0 LIMITATIONS <br />It is the owner's and the owherls representatives' responsibility <br />to read this report and become familiar with the recommendations <br />and suggestions presented. We should be contacted if any questions <br />arise concerning the geotechnical engineering aspects of this <br />project as a result of the information presented in this report. <br />} This report is based on assumed subsurface conditions at each <br />proposed site reviewed and does not include subsurface explora- <br />tions. It is our opinion that subsurface conditions may exist <br />1 which were not included in our slope stability analysis. It may be <br />• prudent to provide subsurface explorations and obtain subsurface <br />9 <br />~tambert ana ~,o,oociate,~ <br />CONSULTING GEOTECNNICAL ENGIN EERi AMD <br />MATERIAL TESTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.