My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44628
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44628
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:05 PM
Creation date
11/20/2007 12:00:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997089
IBM Index Class Name
Permit File
Doc Name
CONSTRUCTION MATERIALS REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />zo <br />UNIT II i~II~iING AREA <br />Reclamation of Unit II shall commence, as before with Unit I, as the gravel extraction <br />from that unit is nearly complete, in the southwest comer. After increasing the project <br />financial warranty to include the mining activity for Unit III, the overburden stockpiled <br />upon and the naturally occurring overburden covering un-mined gravel deposits within <br />Unit III shall be transferred and spread evenly over the worked-out pit floor of Unit II to <br />flatten it and finish-grade it to rrratch the grade of the mined and reclaimed Unit I area, <br />adjacent [o the south. Back-filling and reclamation of the east 200 feet of the worked-out <br />Unit II mining azea shall be delayed, however, to allow its use as an extension of the <br />Proc/Stock azea for on-going operations. The remaining steep west headwall of the <br />5nished pit shall be "cut 'n fill" graded to shallower that 3:1 back-slopes. 3-foot earthen <br />berms shall border the east and north perimeters of the backfilled pit, as before, to prevent <br />surface water runoff. Prepared surfaces shall be topsoiled from the topsoil stockpile lying <br />west of the pit, seeded, and mulched as earlier specified at the eazliest climatic opportunity. <br />South portions of the Proc/Stock azea no longer needed for operations shall be rip- <br />loosened by bulldozer or road grader and topsoiled 6 to 10 inches deep from the topsoil <br />stockpiled at the south boundary. Seeding and mulching per the listed speciScations shall <br />follow at the eazliest climatic opportunity. <br />The project financial warranty shall be proportionately reduced for phased reclamation <br />performed and completed. <br />UNIT III do SUCCEEDING IViINING AREAS <br />Back-filling of the worked out pit with overburden taken from the next mining unit <br />(following appropriate financial warranty posting) shall occur for each mining azea <br />completed in rum as the muting progresses north a unit at a time. Simile pit floor grading, <br />west headwall slope reduction by cut & fill dozer shaping, perimeter berming, topsoiling <br />from west topsoil stockpiles, speciScation seeding & mulching, and financial warranty <br />reduction shall occur as appropriate. <br />B.L.NL SEEDING SPECIFICATION <br />Seed shall be applied with a grass seed drill at the specified rates to a one-half to three- <br />quarters inch depth in a firm, lightly-tilled seedbed. Steep azeas are to be hand broadcast at <br />double the specified drill-applied rates and dragged for specified seed cover. Weed-free <br />straw or hay mulch shall be applied after seeding at two tons per acre, and crimped into the <br />soil with an un-canted disc or mulch crimper. <br />The seed mix shall be as follows. <br />
The URL can be used to link to this page
Your browser does not support the video tag.