CONSTRUCTION MATERIALS REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />19 <br />RECLAMATION PLAN <br />SEC 12 dr. 13, TSSN, RI7R', NMPM <br />STOKE GRAVEL Pr <br />DAREN STOKE-PROPRIETOR <br />EXHIBIT E <br />UPTIT I MIPIING AREA <br />Phased reclamation shall commence with the neaz-completion of extraction of gravel <br />material from the Unit I mini 'azea. Beginning at the southeast comer of that unit, <br />stockpiled overburden (approximately 3,100 CIS from south of the south edge of the <br />excavation shall be bulldozed into the worked-out pit floor against the south headwall to <br />reduce the steep headwall to shallower than 3-Horizontal to 1-Vertical (3:1) slopes. <br />Upon the complete extraction of Unit I gravel materials the permit financial warranty shall <br />then be increased to include the mining activity of Unit II also. Overburden (approx. <br />3,500 CIS stockpiled north of Unit I upon the south half of Unit II and the naturally <br />occurring overburden (approx. 6,300 C17 covering the south half of un-mined Unit II <br />gravel deposits shall be bulldozed into the worked-out pit floor of Unit Ito flatten that <br />1.38-acre azea to finish grade. The remaining overburden from the north half shall be <br />transferred to a stockpile north of Unit II for the eventual back-fillitrg of the worked-out <br />Unit II extraction area. <br />What is left of the steep west headwall of the worked-out pit shall be dozed to a shallower <br />than 3:lfinished slope bank by "cut 'n 5ll" shaping. The east edge of the Unit I mining <br />unit shall "daylight" out at grade level towazd the process/stockpile (Proc/Stock) area, <br />except that a 3-foot earthen berm shall be left at that east edge and along the north edge to <br />retain surface moisture and prevent silt-laden run-off from the mined area flowing into the <br />Proc/Stock azea, or into the next on-going mining azea to the north. <br />The back-filled pit slopes, floor, and water retainment berms shall be top-soiled from the <br />stockpiled topsoil at the west side of the mined-out unit, utilizing an elevating wheeled- <br />tractor scraper fora 6- to 10-inch depth of growth-medium cover. At the eazHest climatic <br />opportunity, late fall or eazly spring, the prepazed, lightly tilled, furrl seedbed shall be drill- <br />seeded with the following BLM-specified seed mix. Slopes too steep to dn71 shall be <br />broadcast seeded at double the specified drilling rate and dragged for aone-half to three- <br />quarter- inch seed internment. All seeded surfaces shall be evenly spread with two tons of <br />weed-free straw or hay mulch and the mulch crimped into the soil with an un-canted disc <br />or appropriate mulch crimper. <br />The project financial warranty shall be appropriately reduced for phased rec4vnation work <br />performed upon the completed mining unit, with enough financial warranty retained to <br />cover any remedial re-seedirtg, if necessary. <br />