Laserfiche WebLink
<br />iz <br />A~IINING PLAN <br />SEC 12 & 11, T35N, RI7W, NbIPh7 <br />STONE GRAVEL PIT <br />DAREN STONE -PROPRIETOR <br />EXHIBIT D <br />A wheeled front-loader is to be employed in grade level <br />excavation of surface alluvial gravel deposits at the full <br />depth of the gravel resource, following the stripping and <br />stockpiling of 6 to 12 inches of surface soils (including <br />vegetation). Initially financial warranty shall be posted <br />only for reclamation for the disturbance of the <br />process/stockpile area, for the entire activity of mining <br />the first unit, and for stripping surface soil from the <br />second unit to be mined. <br />MINING UNIT I <br />The initial unit to be mined, "Unit I", is located 100 feet <br />north and 150 feet east of the southwest permit/property <br />corner. It extends 150 feet north and 350 to 450 feet east, <br />encompassing 1.4 acres of mining surface. The next 150-foot <br />wide unit to be mined shall be directly north of Unit I, but <br />extends several hundred feet further east than Unit I at its <br />north boundary. A 4-acre process/stockpile (Proe/Stock) <br />area just east of Units I 6 II, being approximately 400 by <br />400 feet, including the existing main access road, shall <br />initially be stripped of 6 to 12 inches of surface soil and <br />leveled up for use. Such surface soils stripped shall be <br />stockpiled along the west half of the south edge of that <br />Proc/Stock area, and shall be seeded for erosion control per <br />the reclamation seeding specification of Exhibit E below. <br />Next, 6 to 8 inches of surface soils shall be stripped from <br />the mining IInits I 6 II, to be placed between the west <br />boundaries of those units and the west permit/property <br />boundary. A 25-foot setback shall be maintained between <br />that "topsoil" stockpile and Units I 6 II to allow room for <br />"cut & fill" slope reduction of the west headwalls of those <br />mining units. Surface stripping and stockpiling shall be <br />accomplished with elevating wheeled scrapers, tracked bull- <br />dozers, or a combination of scraper/bulldozers. Topsoil <br />