Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />) 313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 8663567 <br />FAX: (303) 832A706 <br />September 20, 2005 <br />Mr. Paul Gesso <br />Banks & Gesso, LLC <br />720 Kipling Street, Suite 117 <br />Lakewood, CO 80215 <br />RE: 4th Adequacy Review Comments - MMRR Quarry, Regular 112 Application <br />Class: Permit File No. M-2004-067 <br />Deaz Mr. Gesso: <br />COLORADO <br />DIVISION O F <br />MINERALS <br />GEOLOGY <br />AEC LANQIOMMIN INO <br />SAFETY•SCIENCE <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Listed below are remaining adequacy concems on the above-captioned Regular 112 Application for 526.70 <br />permitted acres. The recommended decision date for your application is currently scheduled for November <br />15, 2005. Two (2) copies of your adequacy response must be submitted and received by the Division by <br />no later than 5:00 P.M. on October 31, 2005 to allow Division staff sufficient review time. Please be <br />advised that you will need to provide all information or commitments requested below and/or resolve all <br />remaining concems of the Division on or before the November 15, 2005 recommendation date. Failure to <br />do so will result in a Division recommendation of denial of your application. Please note that Highway <br />119 Access Points "A", "B", & "C" referred to below pertain to "A" - original pem3it application filed on <br />November 9, 2004, "B" -amended application filed on April 11, 2005, and "C" -revised final location <br />filed on August 19, 2005. <br />A. Public Notice Requirements -The Applicant will need to confirm that all public notice requirements <br />per Rules 1.6.2, 1.6.5, & 1.6.6 have been completed. This will include the Applicant verifying it has sent <br />written notice to the Silver Dollaz Metro District and any other propertyJutilityfstructwe owners within 200 <br />feet of proposed access points "B" ar "C" that were not properly noticed during the public notice period <br />for the amended application. Those individuals or uti]ityJstructure owners that will be receiving a notice <br />from the Applicant will have 42 days from the date of receipt of such notice to submit written comments to <br />the Division. The notice(s) must be sent in a timely manner to those owners so that the 42 day time period <br />for written comments by those owners ends no later than November 7, 2005; so that the Division will have <br />sufficient time to review those written comments prior to the November 15, 2005 Division recommended <br />decision date. As a part of this requirement, the Applicant will need to submit certified mail return receipts <br />from each individual or utility/structure owner noticed. Please provide. <br />B. Blasting Plan - Alan Sorenson is reviewing specific Best Management Practices (BMP's) to be <br />implemented prior to, during, and after blasting operations to minimize the generation of dust from <br />blasting operations. Mr. Sorenson's review comments will be forwarded to you as soon as they become <br />available. <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />