My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44537
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44537
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:00 PM
Creation date
11/20/2007 11:56:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
VOLUME 2 MINE PLANNING APPENDIX - VENTILATION PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMANENT STOPPINGS <br />1. All ventilating devices such as stoppings, overcasts, under- <br />casts and shaft partitions shall be constructed of substantial <br />• and incombustible material, installed in a workman-like manner, <br />and maintained in a condition to serve the purpose for which <br />they were intended, The exposed wood used to wedge a stopping, <br />overcast or undercast does not have to be covered with a seal- <br />ant on side opposite the sealant application as long as a fire- <br />retardant material is applied. Overcast wing walls may be <br />built using metal Kennedy stoppings or wooden squeeze seal <br />blocks as long as both sides of the wood are covered with an <br />approved sealant or a fire-retardant material. <br />2, Permanent stoppings shall be erected between the intake and <br />return aircourse and shall be maintained to and including the <br />third connecting crosscut outby the faces of the entries. Per- <br />manent dry stacked block stoppings that will exceed two years <br />in life will be sealed on both sides with an approved construc- <br />tion type sealant, Dry stacked block stoppings with less than <br />two years' life will be sealed on one side with an approved <br />non-construction type sealant, Metal Kennedy stoppings may be <br />used between the intake and return regardless of mining life of <br />. the area. Whenever the third connecting crosscut is broken <br />through, work shall be started on building the stopping as soon <br />as possible and shall be continued in a reasonable and diligent <br />manner until completed. Similarly, whenever a belt move is <br />completed, temporary brattice shall be installed immediately <br />and work shall be started on building the permanent stoppings <br />as soon as possible and shall be continued in a diligent manner <br />until completed. All permanent block stoppings may be sealed <br />on only one side with a non-construction type sealant for 10 <br />stoppings from the face to allow for final sealing with appro- <br />priate type sealant of several stoppings at once. <br />3. Metal Kennedy stoppings or dry Stacked block stoppings covered <br />with an approved non-construction type sealant on one side may <br />be used between the belt haulageway and intake air courses. <br />The exposed wood used to wedge a stopping does not have to be <br />covered with sealant on opposite side. Timbers or wood blocks <br />laid longitudinally "skin to skin", and packed with rock dust, <br />may be used in heavy or squeezing areas if the timbers or wood <br />Page Thirteen <br />• 1 Revised 04/13/81 <br />Revised 05/27/81 <br />Revised 08/05/82 <br />Revised 09/09/83 <br />Revised 06/25/84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.