Laserfiche WebLink
~+ :r <br />• Page 2 July 1, 1999 <br />The slurry wall design criteria will be submitted to the DMG for review when available. <br />The applicant proposes that the permit be issu:d, contingent on DMG approval of the <br />slurry wall plans, or upon approval of a technical revision, whichever is appropriate. <br />The Taft Hill ditch system is still in the design stages with Larimer County <br />Engineering, but should not require a technical revision, prior to implementation, <br />c~since it is outside the proposed permit boundary for the Stegner project, and is on <br />land owned by the county. <br />I hope this additional information is helpful. Flease feel free to contact me with any <br />other questions. <br />Stan Peters, P.E. <br />Project Engineer <br />Attachments <br />Cc: Martin Lind, Poudre Tech Aggregates, Inc. <br />Norm Roche, Golden's Concrete Co. <br />John Stegner <br />