My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44514
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:58 PM
Creation date
11/20/2007 11:56:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013A
IBM Index Class Name
Permit File
Doc Date
7/3/2003
Section_Exhibit Name
Exhibit 19 Bond Calculation
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />M R-6 <br />Reclamation Cost Summary <br />Coal Stockpile Disposal Plan <br />Golden Eagle Mine <br />• <br />Maximum Coal Stockpile Storage Capacity: 60,000 tons <br />Bonding Requirement (508 of Maximum): 30,000 tons <br />Coal Stockpile Disposal Plan <br />Raw Coal: 30,000 tons <br />Assume: 1. Coal is transported via truck to Waste Pile. <br />2. Average haul distance is 1000 feet. <br />3. Coal is placed in 2' layers <br />Depth = 30,000 tons x 1.25 c.y./tn x <br />27 cu.ft./c.y. = 1,012,500 cu.ft. <br />Waste Pile area = 230,000 sq.ft. <br />Depth = 4.4' <br />4. 20 c.y. dump trailers; 1000' round trip <br />3 trucks - 6 trips/hr @ ;50/hr each <br />5. Front-end loader @ ;65/hr <br />Dozer/compactor @ ;100/hr <br />6. Reclamation of Waste Pile surface area has <br />already been included in previous bonding <br />calculations. <br />TOTAL COST (30,000 tons x 1.25 c.y./tn)/(20 c.y./trip x <br />3 trucks x 6 trips/hr) = 104 hr <br />104 hrs x (3 trucks @ ;50/hr + 1 front-end loader <br />@ ;65/hr + 1 dozer @ ;100/hr) <br />-J <br />TOTAL BOIID (For Coal Stockpile Disposal) <br />_ ;32,760 <br />12/31/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.