Laserfiche WebLink
<br />EXHIBIT 19 <br />BONDING SCHEDULE <br />MR 59 <br />METHANE VENT PUMPS <br />1. Site Removal - 6 Locations <br />a)Remove fencing around sites <br />Labors 6 x 4hr. @ $20/hr $480 <br />b) Remove gravel base and haul to disposal area <br />Front end loader 6 x 2hr. @ $50/hr $600 <br />Dump truck 6 x 2hr. @ $45/hr $540 <br />c) Remove pump units <br />Labor with Truck 6 x 2hr. @ $25/hr $300 <br />• <br />2. Reclamation and Vegetation of sites <br />Currently included in Degas Hole reclamation <br />of drill sites. ~ 0 <br />TOTAL $1920 <br /> <br />