. L. Degasification Holes E-1, E-2, E-3 <br />1. Regrade pads: <br />2 pads @ 2 hours/pad @ $60/hour S 360.00 <br />2. Backfill mud pits: <br />2 pits @ 1 hour/pit @ $60/hour 180.00 <br />3. Regrade roads: <br />200 feet @ 1 hour/500 feet @ S60/hour 84.00 <br />4. Reseed roads and pads: <br />(a) 700 feet lon x 13 feet wide x $250/acre 52.00 <br />43,560 ft acre <br />(b) 0.17 acres x 2 pads x $250/acre 127.50 <br />$ 803.50 <br />5. Sealing and plugging holes: <br />Hole E-1 (311 feet) <br />(a) Install bridge plug <br />8 hours rig time @ $125/hour $ 1,000.00 <br />bridge plug cost 500.00 <br />(b) Cement long-string casing outside to <br /> depth3of 260 feet, 12.25 inches diameter <br /> 82 ft = 71 bags cement @ $5.00/bag 355.00 <br />(c) Cement long-string casing inside to a depth <br />• of 3003feet, 8.9 inches inside diameter <br /> 130 ft = 113 bags cement @ $5.00/bag 565.00 <br />(d) Pump truck and bulk cement truck <br /> 4 hours @ 5250/hour 1,000.00 <br />(e) Cut-off surface casing bela~r grade <br /> and weld plate 100.00 <br /> Total E-1 plugging 3,520.00 <br />Hole E-2 (320 feet <br />(a) Install bridge plug <br />8 hours rig time @ $125/hour 1,000.00 <br />bridge plug cost 500.00 <br />(b) Cement long-string casing outside to <br />depth3of 260 feet, 9.875 inches diameter <br />69 ft = 60 bags cement @ $5.00/bag 300.00 <br />(c) Cement long-string casing inside to a depth <br />of 304 feet, 6.4 inches inside diameter <br />66 ft = 58 bags cement @ $5.00/bag 290.00 <br />(d) Pump truck and bulk cement truck <br />4 hours @ $250/hour 1,000.00 <br />Revised 10-10-88 <br />