Laserfiche WebLink
<br />EXHIBIT E <br />Reclamation Plan <br />n <br />The land shall be recaimed as rangeland. Any natural <br />fines remaining from mining operations will be spread over <br />disturbed areas prior to placement of topsoil. Topsoil shall <br />be placed in a 6 to 12 inch lift. All original drainage patterns <br />wall be maintained. <br />Fertilizer, seed, and mulch shall be as per the attached <br />rcecommendations of the Soil Conservation Service. All <br />reclamation will be done in the sequence and with the rates <br />re:co~nended. <br />The land shall be contoured so as to maintain drainage <br />ir.. its undisturbed patterns. <br />