My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44359
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44359
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:50 PM
Creation date
11/20/2007 11:54:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
1/3/1989
Doc Name
BATTLE MTN RESOURCES INCADEQUACY COMMENTS
From
CAMILLE M FARRELL
To
STEVE G RENNER
Section_Exhibit Name
Adequacy letter
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />44. Please specify the pond sediment accumulation monitoring, maintenance and <br />disposal measures proposed. <br />Section D.7.4.3 Leak Detection System <br />45. Please specify the Teak detection monitoring schedule, reporting <br />procedures, and mitigation methods. <br />Section D.8 Project Water Balance <br />Section D.8.2 Heap Leach Facility <br />46. The narrative explains the draindown from deactivated areas has been <br />estimated at 10 gallons per ton of ore with the remainder of solution being <br />held by capillary forces at the estimeated field capacity of 12 percent <br />moisture content. Have any laboratory measurements been taken to verify <br />either the 10 gallon per ton draindown or the remaining 12 percent remaining <br />moisture content of the actual sized material? If not, please consider such <br />that actual water balance and adequate pond size design specifications can be <br />acheived. <br />Section D.9 Diversions and Sediment Control and Drainage Crossings <br />Section D.9.1 Diversions <br />47. The narrative was corrected to refer the reviewer to Figure C-11 (as <br />opposed to Figure C-7) to locate the heap leach facilities ditch illustrations. <br />48. The reader was directed to Figure C-11 and Figure D.9-1 for Tailing <br />Facility ditch location and design, respectively. <br />49. The reader is referred to Figure C-9 for the Heap Leach Facility Design <br />illustrations of Typical Sections of Type 1 and 2 Interceptor Charnels. <br />
The URL can be used to link to this page
Your browser does not support the video tag.