Laserfiche WebLink
. •~ i~ • • <br />Resolution r7o. 1987-23 <br />Page 5 <br />2. All verbal and written represent.at.ions of t1,E~ Applicant. or tl,e <br />Applicant's representatives are },ereby made conditions of t},is approval. <br />3. T},e operations of t},e Willow Bend Sandpit sl,al be, at all times, <br />in compliance with tl,e findings of t},is Board as stated },e ein above. Speci- <br />fically, at. no time s},all t},e extractive operations go bey nd tl,e actual sand <br />bar area located within t},e boundaries of the affected mi ing area as stated <br />on tl,e land use application, consisting of about 1.0 0 1.5 acres. The <br />operations shall consist of only one medium-sized front- nd loader and, at <br />any given time, only one medium-sized dump tnick, of ten to twelve yards of <br />hauling capacity, shall be loaded on tl.e site. There i to be no stock- <br />piling, cn,s},ing, or processing of any materials at tk~e s to nor any storage <br />of equipment, machinery, or vehicles, except for tl,e fron -end loader during <br />actual mining operations, at t},e site. All equipment a vehicles located <br />and operated on t}~e site s}.all },ave fully operation 1 muffler devices <br />attached at all times during operation. T}~e hours of peration s},all be <br />confined to daylight, and in no case earlier t}ian 7:30 a m. nor later than <br />6:30 p.m., Monday tl,roug}, Saturday. T},ere is to be no c shing or material <br />processing operations conducted on the site at any time All hauling and <br />equipment movement is to be confined to t},e mine area and he haul road to <br />U. S. Hwy. 550. The haul road to U. S. Hwy. 550 s},all be raveled and dust- <br />retardant applied, as necessary, to control fugitive dust. Tl~e operator is <br />to use appropriate techniques and materials to control any fugitive dust <br />w},icl, may be generated by the operation so as to prey nt any detectable <br />levels of particulates from leaving the site. There are o be no operations <br />on ti,e site during periods of high water or during perio s when t),e Animas <br />River is at flood stage. Any equipment or machinery p esent on t},e site <br />shall be promptly removed during periods of hig}i water o when flood danger <br />is present. There shall not be any encroact,ments, fil s, stn~ctures, or <br />substantial improvements located wit},in the floodway of tl, Animas River. <br />• 4. Periodic Review and Enforcement.: T},is land use approval is <br />expressly contingent upon and subject to the operators receipt of a,id <br />compliance with all required state permits or approvals, 'ncluding, but not <br />limited to, the permit for tf,e proposed operation require from the Colorado <br />Mined Land Reclamation Board. S},ould t},e Colorado Mine Land Reclamation <br />Board or any ot},er state agency, whose permit or approval s required for t},e <br />Sandpit operation, suspend or revoke suc}, permit or appro al for the opera- <br />tion, tl,e County's land use approval shall be deemed suspe ded or revoked, as <br />appropriate. T},e operation of the Sandpit s1,a11 be review d by t},is Hoard on <br />a biannual basis to determine if tl:e operation is in c mpliance with tl,e <br />terms and conditions of County land use approval set for h in this Resolu- <br />tion. Sucl, biannual review shall be }field wit},in the nine y (90) day period <br />preceding such anniversary date. Any written allegations l,at t},e Sandpit is <br />operating in violation of the terms and conditions of approval s},all be <br />referred to t},e County planning staff for investigation. Tl,e County staff <br />s},all promptly investigate any such written allegations co cerning violations <br />and report t},eir findings to t},is Board. <br />