My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44335
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44335
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:46 PM
Creation date
11/20/2007 11:53:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
3.0 PERFORMANCE BOND REQUIREMENTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Rule 3.02.2 - Determination of Bond Amount <br />(1) The amount of the bond shall be sufficient to assure Che <br />completion of the reclamation plan if the work had to be performed by the <br />Board, through independent contractors, in the event of forfeiture. <br />The amount required for each bonded area shall depend upon the <br />reclamation requirements of the approved permit and shall reflect the <br />probable difficulty of reclamation, giving consideration to such factors <br />as topography, geology of the site, hydrology, and revegetation <br />potential. The amount of the performance bond shall be determined by the <br />Division as part of the decision on permit approval as described in 2.07 <br />and shall be subject to review by the Board as described in 2.07. <br />C2) In order to assure sufficiency, the amount shall be based on, <br />but not be limited to: <br />(a) The estimated costs submitted by the applicant in <br />accordance with 2.05.4. <br />(b) The additional estimated costs to the Board which may <br />arise from applicable public contracting requirements or the need to <br />bring personnel and equipment to the permit area after its abandonment by <br />the permittee to complete the reclamation plan. <br />(c) All additional estimated costs necessary, expedient, and <br />incident to the satisfactory completion of [he requirements identified in <br />• 3.02. <br />(d) Such other cost information as may be required by or <br />3.02-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.